Overtime and Shift Cost Calculator
Estimate crew pay from regular hours, overtime hours, hourly rate and an entered multiplier.
Work pay estimate
Multiply regular hours by the regular hourly rate. Multiply overtime hours by that rate and the chosen overtime multiplier. Add the shift allowance per worker, then multiply by worker count. Two workers with 40 regular hours, 5 overtime hours, a rate of 100 and a multiplier of 1.5 cost 9500.
Limits
The calculator does not determine legal overtime limits or mandatory premiums. The multiplier is only an example. Regular and overtime hours must not overlap. Enter the shift allowance once for the entire period. Taxes, social contributions, leave and payroll deductions are excluded. Check contract terms and applicable rules with a qualified adviser.
Separate amounts per person from totals
For three people, use 8 regular hours and 2 overtime hours per person, regular rate 50 and example multiplier 1.25. Choose a shift addition of 20 per person. Regular pay is 3 × 8 × 50 = 1200 and overtime pay is 3 × 2 × 50 × 1.25 = 375. Additions total 3 × 20 = 60 and overall cost is 1635. Total work is 3 × (8 + 2) = 30 person hours. Neither the rate nor the multiplier claims to be a statutory value.
Overtime pay is the full multiplied pay for those hours, not just the premium difference. Including overtime within regular hours and then entering it again as overtime counts it twice. The shift addition is a period total per person, not an hourly supplement.
If workers have different rates or hours, calculate groups with matching conditions separately and add their totals. The result is neither net pay nor full employer cost. Taxes, social charges and deductions are not automatically added or subtracted. Payroll scope and the classification of working hours require separate verification.
Frequently asked questions
How do you calculate overtime pay for hourly employees?
For example, 2 workers each working 5 overtime hours at an hourly rate of 100 and overtime multiplier 1.5 receive total overtime pay of 1500.00 currency units. Multiply worker count, overtime hours, hourly rate and multiplier, noting that this preliminary calculation excludes taxes, insurance and payroll deductions and uses an example multiplier rather than a legal entitlement.
Related calculators
-
Civil Engineering
Work Duration and Labour Hours Calculator
Finds total labour hours from quantity and hours per unit, then how many working days a crew needs or how many workers a target duration requires. -
Finance, Cost and Project Management
Material and Labour Cost Calculator
Builds a quote from material, labour and equipment lines with waste, overhead, profit and VAT, plus unit cost. Saved projects, CSV and print. -
HVAC and Thermodynamics
Energy Cost and Payback Period Calculator
Simple and discounted payback, net present value and internal rate of return for insulation, heat pump or solar investments. With price escalation and annual kWh and CO₂ savings. -
Finance, Cost and Project Management
Bid Comparison Matrix
Compare two offers using your scores and weights for up to 20 criteria. -
Finance, Cost and Project Management
Break Even Calculator
Find sales volume needed to cover fixed costs or reach a target profit. -
Finance, Cost and Project Management
Calendar Project Schedule
Build a dated schedule and bar chart from working days, holidays and activity dependencies, with critical activities identified.
Found a mistake or something missing?
If a value looks wrong, a size is missing or you need a feature, write to us and we will fix it.