Rebar Lap and Anchorage Length Calculator
Anchorage and lap length from concrete grade, steel and bar size using TS 500 or Eurocode 2 expressions, also as multiples of the bar diameter. Preliminary.
What are anchorage and lap lengths?
The anchorage length is the straight length a reinforcing bar must be embedded in concrete to transfer its force. The lap length is the length over which two bars overlap side by side to pass force from one to the other. Both depend on the tensile strength of the concrete, the strength of the steel and the bar diameter, which is why they are often quoted as multiples of the diameter, such as 40 ø.
The TS 500 expression
For a ribbed bar in tension with a straight anchorage:
l_b = (0.12 × f_yd / f_ctd) × ø, at least 20 ø
Here f_yd = f_yk / 1.15 is the design strength of the steel and f_ctd = 0.35 × √f_ck / 1.5 is the design tensile strength of the concrete. TS 500 sorts bars into two bond positions. Bars that are vertical or steep during concreting, and horizontal bars in the lower half of the section or more than 300 mm below the top surface, are Position II and keep the length as calculated. All other bars, such as the top steel of a deep beam, are Position I and the length is multiplied by 1.4. Above 32 mm the length is also multiplied by 100 / (132 − ø). A tension lap grows with the share of bars lapped at one section: l₀ = (1 + 0.5 r) × l_b.
The Eurocode 2 expression
First the bond strength: f_bd = 2.25 × η₁ × η₂ × f_ctd. The basic required length is l_b,rqd = (ø / 4) × (σ_sd / f_bd). The design anchorage length is that value times the α coefficients, with a lower limit. A lap also uses α₆ (1.0 to 1.5), which depends on the share of bars lapped in the same zone.
Example
C25/30 concrete, 500 MPa steel, 16 mm bar, good bond: f_ctd = 1.197 MPa, f_bd = 2.693 MPa, f_yd = 434.8 MPa. The basic length is 16 / 4 × 434.8 / 2.693 = 646 mm, about 40 bar diameters. With all bars lapped in one zone, α₆ = 1.5 and the lap length is 969 mm.
Limits
This tool applies only the basic expressions above. Seismic detailing rules for laps in columns and beams, hooked and mechanical anchorages, bundled bars, welded fabric and National Annexes are outside its scope. The result is preliminary. The lengths on the drawings and the code in force always take precedence.
Frequently asked questions
How many metres of lap length are required?
For an example 16 mm ribbed tension bar with 25 MPa concrete, 420 MPa steel, bond position II and 100 percent of bars lapped in one section, the Turkish concrete code relation gives 0.9016 m of lap. Anchorage length is multiplied by the lap factor, with material factors 1.5 and 1.15. This preliminary calculation excludes seismic splice rules, mechanical anchorage and extra increases, without rounding up for construction.
Related calculators
-
Civil Engineering
Rebar Weight and Quantity Calculator
Rebar weight per metre, total length, kilograms and tonnes from rows of diameter, length and quantity, with a summary by diameter and CSV export. -
Civil Engineering
Rebar Spacing and Quantity Calculator
Bar count from spacing, centre spacing and clear gap from bar count, and the largest spacing for a required steel area, with steel area per metre. -
Civil Engineering
Stirrup Length and Quantity Calculator
Cutting length of a closed stirrup from the column or beam section, the number of stirrups with or without closely spaced end zones, total length and weight. -
Civil Engineering
Bar Bending Schedule (BBS) Calculator
Cutting length, total length and weight per bar mark from diameter, shape and dimensions. Straight, L, U and stirrup shapes, bend deduction, CSV and print. -
Civil Engineering
Brick and Block Quantity Calculator
Number of bricks, concrete blocks or AAC blocks from wall and unit dimensions, with openings, joints, waste, units per square metre and joint mortar volume. -
Civil Engineering
Chemical Anchor Resin Volume and Cartridge Calculator
Finds the injection resin volume, the total with waste and the number of cartridges from hole diameter, rod diameter, embedment depth and quantity.
Found a mistake or something missing?