Labour Productivity Calculator
Finds output per labour hour, labour hours per unit, daily crew output and efficiency against a target from work done, crew size and time worked.
How is labour productivity calculated?
Productivity shows how much work comes out for the effort put in. Effort is measured in labour hours: the number of workers times the hours worked. Productivity is quoted in two ways:
- Work per labour hour: v = quantity of work / labour hours. A larger number means a more productive crew.
- Labour hours per unit of work: a = labour hours / quantity of work. This is the form used in unit rate build ups. A smaller number means a more productive crew.
Each is the reciprocal of the other.
Example
Suppose a crew of four working 8 hours a day lays 120 m² of blockwork in 3 days. The effort is 4 × 8 × 3 = 96 labour hours. Productivity is 120 / 96 = 1.25 m² per labour hour, so each square metre took 0.8 labour hours. The crew produced 40 m² a day, or 10 m² per worker per day.
Comparing with a target
If the bid assumed 1.5 m² per labour hour, the actual 1.25 is 83 percent of target. The same work at the target rate would have taken 80 labour hours, so 16 extra hours were spent. Multiplying that variance by the hourly rate gives the labour cost overrun.
Limits
Productivity changes with the difficulty of the work, weather, material flow and crew experience. A single day can mislead, so look at the average over several days. The tool does not use a published table of rates, you enter the target yourself.
Check which quantity defines the target
The target field expects production per labour hour. If your target is effort per unit of work, take its reciprocal first. Otherwise target and actual values describe different quantities and the efficiency percentage loses meaning. Enter work quantity in the unit used to define the target. Area production and volume production cannot be compared in a single ratio.
For an illustrative example, three workers complete 90 m² over 2 days, working 5 hours daily. Total effort is 3 × 5 × 2 = 30 labour hours. Actual production is 90/30 = 3 m², read per labour hour. If the user selected target is 4 m² per labour hour, attainment is 3/4 = 0.75, or 75 %. The same work at target would require 90/4 = 22.5 labour hours. The difference from actual consumption is 7.5 labour hours.
This difference does not imply an equal calendar delay. Crew size, working hours and task sequence also matter. When combining days, divide total work by total effort rather than averaging daily productivity values. Consistent crew and time records are the basis of a valid comparison.
Related calculators
-
Finance, Cost and Project Management
Material and Labour Cost Calculator
Builds a quote from material, labour and equipment lines with waste, overhead, profit and VAT, plus unit cost. Saved projects, CSV and print. -
Mathematics
Proportion Calculator: Direct, Inverse and Ratio Split
Find the missing value in direct or inverse proportion, or split a total in a ratio such as 1:2:3. See formulas and steps. Free, no account needed. -
Mathematics
Percentage Calculator
Percent of a number, what percent one number is of another, percent increase and decrease, percent change and reverse percentage. -
Civil Engineering
Bar Bending Schedule (BBS) Calculator
Cutting length, total length and weight per bar mark from diameter, shape and dimensions. Straight, L, U and stirrup shapes, bend deduction, CSV and print. -
Civil Engineering
Brick and Block Quantity Calculator
Number of bricks, concrete blocks or AAC blocks from wall and unit dimensions, with openings, joints, waste, units per square metre and joint mortar volume. -
Civil Engineering
Chemical Anchor Resin Volume and Cartridge Calculator
Finds the injection resin volume, the total with waste and the number of cartridges from hole diameter, rod diameter, embedment depth and quantity.
Found a mistake or something missing?
If a value looks wrong, a size is missing or you need a feature, write to us and we will fix it.