Bill of Materials Builder
Expand a product tree and consolidate shared components. Calculate leaf component cost and mass totals, export CSV and print.
Build a product tree
Link each component to its parent code. The quantity on each row is the amount required by one parent. Requirements multiply along every path and by the requested product quantity. Shared components are consolidated across all paths. For example, two assemblies with four screws each plus three screws directly attached to the product require 2 × 4 + 3 = 11 screws.
Cost and mass
Totals include only leaf components, which have no children. This prevents counting an assembly and its contents twice. Cost and mass entered for assemblies are excluded. Missing values are counted and make the total incomplete rather than silently implying zero. All unit masses use kg. Ensure every unit cost uses the same monetary scale.
Input rules
Paste a tab separated table without a header. A repeated code must retain the same name, unit, cost and mass. Its children apply wherever that code appears. Cycles, missing parents and duplicate links are rejected. Stock deductions, waste allowances, taxes and manufacturing operations are outside the scope.
Consolidate a shared part through two paths
Let example product P contain 3 assemblies A plus 1 part B attached directly. Each assembly A contains 2 parts B. One product therefore needs 3 × 2 + 1 = 7 parts B. Choosing a product quantity of 4 gives 4 × 7 = 28 parts B. Entering a unit cost of 4 currency units and unit mass of 0.2 kg for B gives a cost of 28 × 4 = 112 currency units and mass of 28 × 0.2 = 5.6 kg. These are selected example components only.
Define code B with the same name, unit, price and mass on both links. Do not enter the B requirement inside assemblies again as a separate total at the upper level. The tool expands and consolidates both paths itself. Adding assembly A's price separately to the total would double count. Before ordering, remember that gross requirements are not the amount that existing stock can cover. Resolve missing cost or mass warnings and verify that each unit represents the same quantity throughout the rows. This preliminary calculation does not create a supply schedule or production plan.
Frequently asked questions
How do you calculate bill of materials cost?
For an example 3 products requiring 2 leaf components each at 5 currency units per component, bill of materials cost is 30 currency units. This preliminary calculation multiplies product and component quantities by unit cost, without counting assemblies twice or including stock deductions, waste and tax.
Related calculators
-
Civil Engineering
Quantity Takeoff Table Sum
Sum pasted table quantities by item and unit. Review every parsed number and skipped row. -
Civil Engineering
Construction Material Takeoff Summary
Collects a material list into groups: waste per line, order quantity rounded to whole packs, amounts and group subtotals. CSV and print. -
Manufacturing, CNC and Welding
CNC Cutting Speed and RPM
Calculate cutting speed from cutting diameter and spindle speed, or find RPM for a target cutting speed. -
Manufacturing, CNC and Welding
CNC Feed Rate
Find linear feed rate from feed per tooth for milling or feed per revolution for turning and drilling. -
Manufacturing, CNC and Welding
Cone and Frustum Development
Calculate development radii, sector angle and area for a cone or frustum from its two radii and height. -
Manufacturing, CNC and Welding
Cylinder Development
Calculate blank length and rectangular area from neutral surface diameter, cylinder height and seam allowance.
Found a mistake or something missing?